Five Factors That Affect the Building Demolition Process

Demolition is more than just tearing out a building that needs to be removed. Successful demolition requires multiple steps and strategic interventions to ensure safety and success in every stage. While smaller demolition projects can be handled through a DIY approach, there are many instances where it makes sense to hire an expert New Jersey commercial demolition contractor for assistance.

These demolition services offer the preparation you need to ensure the site is ready for construction. Not only does demolishing a building clear space for new construction, but it is a necessary step to prevent future issues. 

When you hire a New Jersey commercial demolition contractor, several factors will affect your demolition costs and the overall process.

1. Obtaining Permits and Approvals

Depending on the size and type of demolition project, obtaining necessary approvals and permits is often required. A small job, such as tearing down a small retaining wall, won’t likely require permits. But if you are demolishing all or part of a building, then talk to your New Jersey commercial demolition contractor to determine whether permits will be needed.

Factors that might affect the need for permits and approval are if utility removal is involved. There are specific strategies that must be followed for utility abandonment or capping, and the municipality will be involved in these decisions.

The benefit of hiring an expert team for assistance is they understand the local requirements and regulations. Additionally, our team is happy to help with obtaining these necessary permits to make sure that all approvals are in place before demolition begins.

2. Environmental Considerations

Environmental considerations vary depending on the size of the demolition project and the types of materials involved. For example, not only do you need to have strategies in place to take down the building, but it’s also essential to consider how the demolished materials will be removed from the site without damaging the environment. 

This demolition process meticulously plans for various aspects, encompassing the selection of equipment and machinery deployed on-site, strategic disposal of materials, and measures to access and mitigate damage to the property in question. Emphasis is placed on adhering to proper disposal protocols and following the correct demolition procedures to minimize disruption and potential harm to the environment and surrounding infrastructure.

If hazardous materials are on the site, then extra steps might be required to dispose of these materials properly. 

3. The Weather

Weather conditions can play a role in both the cost and timeline of the demolition project. Even though your New Jersey commercial demolition contractor will do their best to stay on schedule, inclement weather can delay the completion of the demolition project. However, it is worth noting that light rain is actually good for demolition as it helps to keep too much dust from stirring up. Additionally, cold weather typically wouldn’t impact your demolition project either. 

If there are weather factors affecting the timeline or outcome, then our demolition team will maintain clear communication so you understand what is happening every step of the way. We have the proper tools and equipment to work in various weather conditions. But there are times when we need to delay the demolition or adjust our strategy depending on the severity of the weather patterns. 

4. Size of the Building

At the outset of the project, we will discuss different types of demolition based on the size of the building being taken down. A thorough site evaluation is necessary to look at the foundational structures, materials we will be dealing with, and the anticipated amount of demolished waste that will need to be removed.

Demolition of a small home is relatively straightforward. But things can be more complicated when we are dealing with larger commercial structures and buildings. We need to evaluate the size of the building, floorplan, and other unique factors to plan the demolition properly.

5. Safety

The safety of our team and everyone in the area is always our top priority when planning and executing demolition projects. The success of your demolition depends on our team following specific safety protocols. 

We use a variety of safety strategies from start to finish. For example, signage and barricades are important for keeping unwanted trespassers away from dangerous areas. If streets or sidewalks are affected, then these areas might need to be blocked off or rerouted. At Mikula Contracting, we coordinate with the local municipality to properly handle no parking signs or police presence if needed. 

Additionally, it is critical to ensure that OSHA standards are always being followed for demolition and construction. These standards manage everything from the way the structure is demolished to physical barriers that reduce the risk of debris and dust infiltrating nearby areas. 

The good news is that a skilled New Jersey commercial demolition contractor has experience with all of these safety practices. We take a proactive approach to ensure the best results every step of the way. 

Schedule Your Free Estimate with Our New Jersey Demolition Contractors

What services and support do you need for your upcoming demolition? If you need to talk to a New Jersey commercial demolition contractor, then we invite you to reach out to our professional team at Mikula Contracting. You’ll see that we have a solid reputation as one of the most trusted providers in the industry. Our team is always here to help with both residential and commercial demolition

Related Posts